Avoiding Danger From Overhead Power Lines: Why?
A lighting tower, a diversion road, and five weeks in hospital
Let’s start with a real one, not a hypothetical.
Just after midnight on 19th January 2024, a three-person team was carrying out hedge maintenance on the A3102 near Royal Wootton Bassett, on a road that was doubling as a diversion route while the M4 was closed. Mr P, 26, was pushing a mobile lighting tower into position when it made contact with an 11,000-volt overhead line.
He couldn’t let go. His body locked, he felt his skin cooking, and he heard what he described as electricity “in his head” before he blacked out. He came round to find a hole burned clean through his arm and hip, down to the bone. Five weeks in hospital, multiple surgeons, and even now, over two years on, he says he still can’t go back to the job he loved.

The HSE investigation found the employer had arranged the necessary permit to work at night, but had not properly planned for or risk assessed the overhead line running above the works. The company was later fined £60,000, plus costs, for breaching the Electricity at Work Regulations. As the HSE inspector put it bluntly, Mr P is lucky to be alive, and the incident was entirely preventable.
When we talk about overhead line risk, our brains jump straight to the obvious stuff: tipper wagons, excavators, mobile elevating work platforms. But the line doesn’t care what’s underneath it. Lighting towers, scaffold poles, ladders, flag poles, fishing rods, kites, even a well-aimed spade held at the wrong angle, if it’s long, conductive, and gets close enough, it can kill. Everyday tasks and everyday items carry the same risk as the “obvious” plant, and they get nowhere near the same level of attention in planning.
So let’s chat:
The legal bit (kept mercifully short)
Yes, there’s a legal duty here. Under the Health and Safety at Work etc. Act 1974 and the Management of Health and Safety at Work Regulations 1999, you’re required to identify hazards, assess the risk, and put in place a safe system of work, and that includes overhead lines. The Electricity at Work Regulations 1989 add specific duties around precautions against injury from electrical hazards. If contact happens and you didn’t plan, didn’t assess, and didn’t control, HSE will ask why, and “we didn’t think a lighting tower counted” will not land well in that conversation.
That’s the statutory skeleton. Now let’s talk about the thing that actually helps you avoid ending up in front of an inspector in the first place.
HSE GS6: the document you should already know
If you’re planning, managing, or working anywhere near overhead lines, you need to know HSE Guidance Note GS6, Avoidance of Danger from Overhead Lines. If you’re reading this and you’ve never heard of it, that’s fine, nobody’s judging, but as a precaution, it might be worth pausing whatever your teams are doing outdoors right now until you’ve had a read.
GS6 is the go-to guidance for planning work near overhead lines: how to assess the risk, what control measures look like, and, usefully, it includes worked examples of physical barriers like goalposts, bunting, and ground-level markers that you’ll see all over UK sites.
“It’s only guidance, they can’t do anything to me for ignoring it”
We hear this constantly, so let’s deal with it head-on.
Technically, that’s true, guidance isn’t law. But think of it like the Highway Code. Nobody goes to prison purely for breaching the Highway Code. But if you’re in a collision and it’s shown you ignored it, that non-compliance will be used against you in deciding whether you were negligent, and from there, whether you’re being prosecuted under something that is law.
Same principle with GS6, ENA technical standards, and industry best practice generally. Follow the guidance, or do more than it asks, and you’re generally in a strong position to demonstrate you’ve met your obligations under the Health and Safety at Work Act, Section 2, and similar duties. Ignore it, or do less, and you shouldn’t be shocked (sorry) when an incident leads to a very uncomfortable interview under caution.
Guidance can be vague in places, and that’s true, but it’s not a flaw, it’s by design, because it can’t predict every site’s layout. That’s exactly where competence comes in. Old-school acronym time: SKATE, Skills, Knowledge, Attitude, Training, Experience. Guidance plus a genuinely competent person interpreting it for your specific site is the combination that actually keeps people alive.
Talk to the network operator. Actually talk to them.
Distribution Network Operators and National Grid want to help you, they have posters, literature, planning guidance, and dedicated teams for exactly this. If your organisation regularly works near overheads or underground services, build a relationship with them.
The technical standard: ENA TS 43-8
Alongside GS6, there’s a technical specification worth knowing about, ENA TS 43-8, Overhead Line Clearances, produced by the Energy Networks Association. It sets out the minimum clearances required between overhead lines and objects, ground, structures, and other lines. It’s a dense, technical document, and it’s not meant to replace GS6, the two are designed to be read together, but if you’re doing anything involving clearance distances, it’s worth having someone competent digest it properly.
Survey meters: small kit, big help
Non-contact voltage and clearance meters (Suparule) are a genuinely useful bit of kit, and they don’t need weeks of training to operate. They help you understand actual dimensions on site against line height, sag, and clearance, rather than eyeballing it and hoping. If your teams are regularly working near overheads, it’s worth having someone trained up on one.
Other documents worth having on your radar
• CDM (Construction (Design and Management) Regulations): overhead line risk is exactly the sort of pre-construction information that should be flowing from client to designer to contractor.
• HSE tree work safety guidance: directly relevant, given how many overhead line incidents (including the one above) happen during hedge and tree maintenance.
• HSE AIS8: the agricultural information sheet covering overhead line risk for farming and land-based activity, where masts, irrigators, and tall machinery are a constant hazard.
First, try to avoid it altogether
Before you get anywhere near barriers and bunting, ask the boring question first: do you actually need to work near that line at all?
Try to avoid working near overhead lines in the first place, that’s always the best starting position. If you genuinely can’t avoid it, the next port of call is trying to get it switched off, diverted, or sleeved. Some lines are already sleeved as standard, so don’t assume protection isn’t there just because you can’t see bare conductor, check with the line owner rather than guess.
Whatever degree of risk is left after that, and on most sites, there will be some, the job then becomes controlling the operation around it properly.
Controls: know what your people and plant are actually going to do
Guidance is good, but it can’t predict your specific operation. So the starting point is always the same: walk the site, do a proper point-of-work risk assessment, and work out exactly what people and plant will be doing in that area, whether they’re working adjacent to the line, passing underneath it, or working directly beneath it. Each of those scenarios needs a different control response.
GS6 kit: goalposts, bunting, barriers, and the art of local variation
This is the bit most people picture when they think “overhead line safety”, GS6-style physical controls, commonly referred to just as “GS6 kit.” The guidance demonstrates a few example layouts: goalposts either side of the line, bunting or blue cones marking a route, barriers, and warning signage.
But here’s the thing worth understanding: GS6 tells you what to use, with little about where and how. So you’ll see genuine variation between sites and clients, and that’s completely normal, provided it’s clearly documented in your safe system of work so everyone on site understands what they’re looking at.
For example, on some sites you’ll see a goalpost either side of the line with blue cones between them. On others, cones are placed 18 metres either side of the goalposts at 3-metre centres, creating an approach route rather than just marking the exclusion zone. Neither is “wrong”, but if your team doesn’t know which version they’re looking at, that’s a briefing failure waiting to become an incident.
As a minimum, you’d be expected to:
• Calculate and apply the correct safety clearance distances, this is where ENA TS 43-8 and a survey meter earn their keep.
• Use non-conductive materials for goalposts and barriers, fibreglass or timber, never metal.
• Deploy bunting, barrels, cones, and signage on the approach, ideally with yellow and black “danger overhead cables” bands and lighting where visibility is reduced.
• Consider a dedicated overhead marshal for complex areas, think of it as a banksman role, but specifically watching the overhead risk.
• Use slew restrictors, chain and boom limiters, or similar engineering controls on plant where relevant.
Don’t forget the people underneath all this kit
For genuinely complex sites, where multiple overheads cross a large civils area, put together a dedicated people and vehicle movement plan: a drawing showing exactly what can move where, and how it passes safely through the area.
It’s easy to build a beautifully engineered exclusion zone and still miss the point, because the biggest variable on any site is the humans working in it. Risk assessments regularly nail the physical controls and say nothing about fatigue, experience level, or how well someone’s actually understood their induction.
Consider the timing and nature of the work your teams are doing (the incident above happened just after midnight, on a live diversion route, and fatigue and reduced visibility were very much part of that picture) and build inductions that actually walk people through the specific risk area, not just a generic site talk. For anything genuinely complex, such as multiple overheads crossing a large civils site, a proper walk-through of what we might call a “red zone” induction for that area is worth the extra half hour. For a single, obvious, well-signed overhead, that level of ceremony probably isn’t necessary, so match the effort to the complexity.
Training: the bit that actually joins it all up
Training is where guidance turns into judgement. Planners, managers, supervisors, and operatives all need a working understanding of GS6, not to recite it, but to apply it to whatever’s actually in front of them that day.
At PGL Midlands, this is genuinely what we do. We deliver GS6 avoiding danger from overhead power lines training and awareness to mainstream tier-one contractors and clients across the country. Our GS6 Nationwide training covers sites wherever you need us, and our GS6 Midlands training courses run from our own facility, with hands-on model kit for a proper immersive session alongside live site set-up examples. We also work closely with the ENA and network operators, so we can help you build the practical relationships and site-specific knowledge, not just tick a training box.
None of this blog is meant to be lifted straight into your method statement (although if it turns out to be more detailed than what’s currently in yours, that’s worth a STOP what you’re doing now lol). But if your people work in or around overhead lines, training isn’t optional. You wouldn’t let someone start drilling into your walls without checking what’s behind them first, so don’t let anyone work near cables that can genuinely kill them without proper knowledge, understanding, and instruction behind it.